Louisiana PSC repository docket for non-binding guidelines on large load additions
Louisiana Public Service Commission · No. X-37921 · Updated Nov 23, 2026, 18:37 ETWhat the case is
Reskill Report summary · the commission lists the case as open
The Louisiana Public Service Commission opened a repository docket, published for information only, for its Large Load Additions Non-Binding Guidelines. The guidelines list areas a utility should address when serving a large new load, such as transmission costs, stranded assets, rates and curtailment.
From the docket: “Notice of repository docket for Large Load Additions Non-Binding Guidelines.”
Official title: Notice of repository docket for Large Load Additions Non-Binding Guidelines. (This matter is being published for informational purposes only. No interventions will be accepted.)
Terms for large users, as proposed
| Term | What it says | The document's words |
|---|---|---|
| Also | Interconnection and network costs caused by the load must be fully assigned to that load. | “Network and interconnection costs caused by the load are fully assigned to the load” Source |
Who is taking part
LPSC Staff; Alliance for Affordable Energy; Louisiana Energy Users Group; Southern Renewable Energy Association; Cleco Power LLC; Southwestern Electric Power Company; Earthjustice; Environmental Defense Fund.
Source
- This case was compiled from the Louisiana Public Service Commission's and the utility's own documents, not from a docket system we read daily, so it shows no filing list and may lag. The case's own page.
- Docket page: “Notice of repository docket for Large Load Additions Non-Binding Guidelines.”
- Commission order: “Network and interconnection costs caused by the load are fully assigned to the load”
- The plain title and summary are ours, written from the docket's title and filing list and checked against them. We have not read every document in the case.
- Nothing here says who is right or what the case will cost any customer.